Inhaltsverzeichnis

Alle Kapitel aufklappen
Alle Kapitel zuklappen
Preface
15
Acknowledgments
17
1 Introduction to MRP with SAP S/4HANA
19
1.1 MRP Basics
19
1.2 MRP within the Supply Chain in SAP Systems
20
1.3 MRP with SAP S/4HANA
23
1.3.1 Classic MRP
24
1.3.2 MRP Live
24
1.3.3 MRP Cockpit
25
1.3.4 Demand-Driven MRP
26
1.3.5 Predictive Material and Resource Planning
27
1.4 Summary
28
2 MRP Basics
29
2.1 MRP Procedures
29
2.1.1 Material Requirements Planning
30
2.1.2 Master Production Scheduling
31
2.1.3 Consumption-Based Planning
32
2.1.4 Demand-Driven MRP
33
2.2 MRP Planning Process
34
2.2.1 Reading the Planning File
35
2.2.2 Calculating the Net Requirements
37
2.2.3 Calculating the Procurement Quantity
38
2.2.4 Determining the Replenishment Proposal Type
40
2.2.5 Scheduling Replenishment Proposals
42
2.2.6 Exploding the BOM
48
2.2.7 Creating Exception Messages
50
2.3 Summary
51
3 Master Data and Basic Settings
53
3.1 Material Master
54
3.1.1 Material Master Overview
54
3.1.2 MRP Type
60
3.1.3 Lot-Sizing Procedures
73
3.1.4 Procurement Types and Special Procurement Types
80
3.1.5 Scheduling Parameters
83
3.1.6 Net Requirements Calculation
85
3.1.7 MRP Area
87
3.2 Procurement Master Data
89
3.2.1 Internal Procurement
91
3.2.2 External Procurement
106
3.2.3 Quota Arrangement
114
3.3 Planning File
119
3.4 Summary
121
4 Configuring MRP
123
4.1 Overall Plant Parameters
124
4.1.1 Maintain Environment
125
4.1.2 Maintain Master Data
128
4.1.3 Maintain Planned Orders
132
4.1.4 Maintain Planning Run
133
4.2 MRP Group
147
4.2.1 Consumption Mode/Adjustment Horizon
149
4.2.2 Horizons
149
4.2.3 Determine Production Storage Location
151
4.2.4 Convert Planned Order
151
4.2.5 Program Plan: Independent Requirements Split
152
4.2.6 Evaluation
152
4.2.7 Planning Run
152
4.2.8 External Procurement
156
4.2.9 Availability Check
157
4.3 MRP Type
158
4.4 Lot-Sizing Procedure
161
4.5 Availability Check
165
4.6 MRP Areas
167
4.7 Parallel Processing
172
4.8 Summary
173
5 Running MRP
175
5.1 MRP Live versus Classic MRP
175
5.2 Classic MRP
179
5.2.1 Control Parameters
179
5.2.2 Single-Item/Single-Level Planning
183
5.2.3 Single-Item/Multilevel Planning
184
5.2.4 Single-Item Interactive Planning
188
5.2.5 Multilevel Sales Order/Project Planning
190
5.2.6 Total Planning Run
191
5.2.7 Master Production Scheduling
194
5.3 MRP Live
195
5.3.1 MRP Dispatcher
196
5.3.2 MRP Live Control Parameters
197
5.3.3 Running MRP Live in SAP GUI
199
5.3.4 SAP Fiori
201
5.4 Planning PP/DS Materials in MRP Live (One MRP Run)
206
5.5 Summary
208
6 Evaluating the MRP Results
209
6.1 Exception Messages
209
6.2 Rescheduling Checks
214
6.3 Stock/Requirements List
218
6.3.1 Individual Access
219
6.3.2 Collective Access
236
6.4 MRP List
242
6.5 Information and Settings for Materials in MRP on SAP HANA
245
6.6 Order Report
246
6.7 Pegged Requirements
250
6.8 Evaluation of the Planning Situation
252
6.9 MRP Cockpit
254
6.9.1 Shortage
254
6.9.2 Accessing SAP Fiori Applications for MRP
256
6.9.3 Monitor and Manage Material Coverage
259
6.9.4 Monitor and Manage Internal Requirements
264
6.9.5 Monitor and Manage External Requirements
266
6.9.6 Monitor and Manage Production or Process Orders (MRP View)
268
6.9.7 Handover Purchase Requisitions
271
6.9.8 Display MRP Master Data Issues
272
6.9.9 Manage Change Requests
273
6.9.10 Detect MRP Situations
280
6.10 Summary
286
7 Managing Planned Orders
289
7.1 Planned Orders
289
7.2 Planned Order Availability Check
294
7.3 Planned Order Conversion
297
7.4 Additional Options for Mass Processing
303
7.5 Summary
307
8 Advanced MRP Features
309
8.1 Subcontracting Planning
309
8.2 Planning Calendar
315
8.3 BOM Explosion Number
318
8.4 Parts Interchangeability
321
8.4.1 Creating an MPN-MRP Set
321
8.4.2 Planning an MPN-MRP Set
324
8.5 Range of Coverage Profile (Dynamic Safety Stock)
325
8.6 Time-Dependent Stock Levels
329
8.7 Segmentation
333
8.7.1 Segmentation Master Data
334
8.7.2 Using Segmentation in MRP Master Data
339
8.7.3 Running MRP with Segmentation
342
8.8 Summary
345
9 Demand Management
347
9.1 What Is Demand Management?
348
9.2 Planning Strategies
352
9.2.1 Planning with Final Assembly (Strategy 40)
354
9.2.2 Net Requirements Planning (Strategy 10)
355
9.2.3 Gross Requirements Planning (Strategy 11)
356
9.2.4 Make-to-Order Production (Strategy 20)
358
9.2.5 Planning without Final Assembly (Strategies 50 and 52)
359
9.2.6 Planning with a Planning Material (Strategies 60 and 63)
361
9.2.7 Planning at Assembly Level (Strategies 70, 74, and 59)
363
9.2.8 Assemble-to-Order (Strategies 81 through 86)
365
9.3 Creating a Demand Plan
366
9.3.1 Maintenance of Planned Independent Requirements in SAP GUI
366
9.3.2 Maintenance of Planned Independent Requirements in SAP Fiori
367
9.3.3 Splitting Independent Requirements
370
9.3.4 Planned Independent Requirements Reorganization
371
9.4 Configuring Demand Management
371
9.5 Summary
374
10 Demand-Driven MRP
375
10.1 What Is DDMRP?
375
10.1.1 Buffer Calculation
377
10.1.2 DDMRP Process
379
10.2 Setting Up DDMRP
381
10.2.1 Product Classification
382
10.2.2 Mass Maintenance of Products
389
10.2.3 Buffer Proposal Calculation
391
10.3 Running DDMRP
395
10.4 DDMRP Analytics
405
10.5 Integrating DDMRP with SAP IBP
407
10.6 Demand-Driven Scheduling
409
10.7 Summary
409
11 Long-Term Planning
411
11.1 Creating a Long-Term Planning Scenario
412
11.2 Running Long-Term Planning
416
11.3 Processing Simulative Planned Orders
418
11.4 Evaluating the Long-Term Planning Results
422
11.4.1 Evaluating the Long-Term Planning Stock/Requirements List
422
11.4.2 Evaluating Work Center Capacity
425
11.4.3 Transferring the LTP Results to the Logistics Information System
426
11.5 Cleaning Up the Long-Term Planning Scenario
430
11.6 Summary
433
12 Predictive Material Requirements Planning
435
12.1 pMRP Basics
435
12.1.1 What Is pMRP?
436
12.1.2 Business Scenarios
436
12.1.3 Comparing pMRP with Long-Term Planning
440
12.1.4 Prerequisites
444
12.2 Master Data
445
12.2.1 Material Master
445
12.2.2 Bill of Material
446
12.2.3 Work Center and Resources
447
12.2.4 Routings and Master Recipes
447
12.2.5 Production Version
447
12.2.6 External Procurement and Quota Arrangement
448
12.2.7 Flexible Constraints
448
12.3 Creating Simulations
451
12.3.1 Scheduling a pMRP Simulation Creation
451
12.3.2 Template Selection
453
12.3.3 Scheduling Options
454
12.3.4 Parameters
455
12.3.5 Evaluating the Simulation Creation Logs
457
12.4 Processing Simulations
459
12.4.1 Process pMRP Simulations App
459
12.4.2 Demand Plan Simulation
462
12.4.3 Capacity Plan Simulation
464
12.4.4 Simulation Components
466
12.4.5 Multilevel Material Simulation
468
12.4.6 Issue List
470
12.4.7 Simulation Summary
472
12.5 Releasing Simulations
472
12.6 Configurable Products
476
12.6.1 Creating PIRs for Configurable Products
477
12.6.2 Simulation for Configurable Products
478
12.6.3 Releasing PIRs for Variant Configuration Components
479
12.7 Demand-Driven Scenarios
480
12.7.1 Using pMRP with DDMRP Products
480
12.7.2 Forecasting Delivery Schedules for Components
482
12.8 Summary
482
13 Administering MRP
483
13.1 Housekeeping MRP
483
13.1.1 Keeping the Planning File Consistent
483
13.1.2 Managing Background Jobs
485
13.1.3 Deleting Old MRP Lists
487
13.2 Troubleshooting MRP
488
13.2.1 Material Not Planned
488
13.2.2 Inconsistencies
490
13.2.3 MRP Live Support Functions
496
13.2.4 Support Tool for MRP
500
13.3 Improving MRP Performance
503
13.3.1 Classic MRP
504
13.3.2 MRP Live
507
13.3.3 Frequent Problems and Solutions
516
13.4 Summary
517
14 Enhancing MRP
519
14.1 Enhancing Classic MRP
520
14.2 Enhancing MRP Live
524
14.3 Enhancing Predictive Material and Resource Planning
527
14.4 Enhancing the SAP Fiori Applications of the MRP Cockpit
528
14.5 Modification of Supply and Demand List
530
14.6 CDS Views
532
14.7 Summary
532
15 Migrating to SAP S/4HANA
533
15.1 Performing a Readiness Check
533
15.2 Assessing Simplifications in MRP
535
15.2.1 Planning File
535
15.2.2 Storage Location Planning
536
15.2.3 Subcontracting
538
15.2.4 Production Versions
539
15.2.5 External Procurement
539
15.2.6 Total Requirements Cleanup
540
15.3 Reviewing Custom Code
542
15.4 Evaluating New MRP Features
543
15.4.1 MRP Live
543
15.4.2 Demand-Driven MRP
544
15.4.3 Predictive Material and Resource Planning
544
15.4.4 SAP Fiori and the MRP Cockpit
544
15.5 Summary
545
A Roadmap for MRP in SAP S/4HANA
547
B The Author
549
Index
551